What Must Be Included on an Evacuation Map? (12-Item Checklist)
Quick answer: A practical evacuation map commonly shows a location-specific YOU ARE HERE marker, available exits and routes, directional arrows, an assembly point when the plan uses one, relevant emergency equipment, accessibility information where applicable, building and floor identification, and a clear legend with a revision date. Federal OSHA does not prescribe a universal 12-symbol map checklist; your adopted code and AHJ determine the final requirements.
Related: fire-specific map elements, are maps legally required?, generate a map now.
Need a clear, site-specific evacuation map draft?
Upload your floor plan, sketch, PDF, or image. OSHAMap generates an evacuation map draft with exits, routes, YOU ARE HERE, assembly point, fire equipment, and a legend — designed to support emergency planning. Final review by a qualified safety professional is required before posting.
Trusted by offices, warehouses, clinics, schools, hotels & manufacturing sites.
The 12-element evacuation map checklist
OSHA 29 CFR 1910.38 requires a written Emergency Action Plan with evacuation procedures and exit-route assignments, but it does not enumerate the visual symbols a posted map must show. The practical working checklist below draws from common wayfinding practice and standards such as ISO 23601; adopted fire, building, or occupancy codes and the AHJ determine what is required at a particular site. For more on the underlying written EAP requirements, see the OSHA evacuation plan requirements guide.
- YOU ARE HERE marker — a clearly contrasting star or dot anchored at the position where the map is posted.
- Primary exit — the closest unobstructed exit from the YOU ARE HERE point, labeled EXIT with a directional pill.
- Alternate exits — show the other available exit routes for that location when they exist.
- Evacuation route arrows — a continuous line from YOU ARE HERE to each exit, color-coded so the primary route is the most prominent.
- Outdoor assembly point — include the site-designated location when the emergency plan uses one.
- Fire extinguishers — mark relevant equipment when required by the applicable code or plan and when the symbols remain legible.
- Fire alarm pull stations — show manual pull stations when required or operationally useful.
- Medical / accessibility equipment — include AEDs, first-aid kits, eyewash stations, and areas of refuge where present and relevant.
- Accessible egress information — show designated accessible paths, areas of refuge, or evacuation-chair locations where applicable.
- Emergency contacts — include site contacts or the building address when the plan or local rule calls for them.
- Building identification — building name, floor number, and north orientation arrow.
- Legend + revision date — plain-language key explaining every icon; include posting date and version number.
This checklist is a review aid, not proof of OSHA, fire-code, or accessibility compliance. A qualified safety professional or your AHJ should confirm the final content and posting plan. For a more detailed fire-focused breakdown, see our fire evacuation map requirements guide and the OSHA exit-sign requirements page.
Exits and routes — the rules behind the symbols
OSHA 29 CFR 1910.36 requires at least two exit routes from most workplaces, located as far apart as practical, and 1910.37 requires those routes to be unobstructed and adequately lit. On the map this translates to two visible EXIT pills minimum, with a continuous route line tracing the actual corridor a person would walk. NFPA 101 §7.6 sets occupancy-specific travel-distance limits (commonly 200 ft for unsprinklered business occupancies, 250–300 ft sprinklered) — if a route on the map exceeds those distances, the floor plan needs another exit, not a longer arrow.
Color-code the primary route differently from the secondary so an occupant reads the safest path in under two seconds. ISO 23601 recommends ISO 7010 safety green for the primary egress line and a contrasting accent (often white-on-green or a lighter green) for backup routes.
Fire equipment and assembly point
Consider marking fire-response equipment that the applicable code, site plan, or AHJ calls for and that occupants may need to locate quickly: extinguishers, manual alarm pull stations, hose reels, or sprinkler controls where present. Specialty environments may add equipment such as Class K extinguishers, eyewash stations, or safety showers. Equipment placement rules do not automatically make every item a required map symbol.
The assembly point belongs outside the building footprint — far enough from the structure to be clear of falling glass and emergency-vehicle access. When the EAP designates an assembly point, it can support the employee-accounting procedures addressed by OSHA 1910.38(c)(4). On the map it should be the most visually distinct icon on the page so people orient to it instantly.
Labels, legend, and accessibility
Every icon used on the map should be defined once in a plain-language legend. Use a sans-serif typeface, high contrast against the floor color, and avoid decorative fonts that fail at typical posting distance (8–10 feet). ISO 23601 specifies minimum sign sizes based on viewing distance — A3 (11.7" × 16.5") is the practical floor for posted maps in offices and corridors, with larger formats for lobbies and assembly areas.
Accessibility matters: the international symbol of accessibility belongs at every accessible exit, area of refuge, and the assembly point. For multilingual workforces, repeat the legend in the primary languages spoken on site. For healthcare facilities, the map should mark smoke compartments and defend-in-place zones — see our clinic evacuation plan maps page for the occupancy-specific overlay.
Where to post the map (and how often to update it)
The map is only useful where people see it before an emergency. The typical posting locations are conspicuous wall positions near every employee entry point, in corridors at decision points, near elevator lobbies, inside guest rooms for hotels, behind classroom doors for K-12, and at every nurse station for healthcare. Mount at 5–6 ft from the floor to the center of the map. For a full breakdown by occupancy type, see our where to post evacuation maps guide.
Update the map whenever the floor plan changes — walls moved, doors sealed, suites combined, fire equipment relocated — and at minimum during the annual review of the written EAP. The single most common inspector finding is a posted map that no longer matches the building. Regenerating from an updated floor plan should take minutes, not weeks.
Generate a draft that includes every element
Upload a floor plan, sketch, PDF, or photo to the free evacuation map generator. OSHAMap returns an OSHA-aligned draft with exits, evacuation arrows, YOU ARE HERE, assembly point, equipment markers, and a legend — designed to support the visual portion of your 29 CFR 1910.38 EAP. Final review by a qualified safety professional, fire marshal, or authority having jurisdiction is required before posting.
Create Your Evacuation Map
See the safety plan from every angleWatch a sketch become a polished map, then step inside.Need to start from a rough layout?Sketch rooms and exits, then turn it into a clear safety map.Drag & drop your floor plan here
or
PNG, JPG, HEIC, TIFF, BMP, SVG, AVIF, WebP, PDF, DOC, DOCX, PPT, PPTX, XLS, XLSX, ODT, ODP, ODS, DXF, DWG - Hand-drawn sketches work too!
No floor plan handy? Try the included floor plan with real AI generation — no upload needed. This may take a minute or longer.
Move, resize, and recolor every exit sign, route, and icon.
Create a free account to save and download in HD. No credit card required.FREE
Frequently Asked Questions
Is this evacuation map generator really free?
Yes — you can generate your first OSHA-aligned evacuation map draft completely free. Just upload a floor plan and our AI drafts a professional map in about 30 seconds. No credit card required.
Are the generated maps aligned with OSHA?
Our AI drafts maps that follow OSHA 29 CFR 1910.36–37 and NFPA 101 Life Safety Code standards. Every map includes clearly marked exits, fire extinguisher locations, assembly points, and directional evacuation arrows. Supervisor review is required before posting to your facility.
What file formats can I upload?
We accept PNG, JPG, GIF, WebP, BMP, TIFF, AVIF, HEIC, SVG, PDF, DOC/DOCX, PPT/PPTX, XLS/XLSX, ODT, ODP, ODS, DXF, and DWG floor plans. Office and CAD files are converted securely before processing; PDF uploads let you choose the source page.
How long does map generation take?
Most maps are generated in 20–40 seconds. Complex multi-floor plans may take slightly longer. You see the preview instantly — create a free account (no credit card) to download the file.
Can I edit the map after generation?
Yes — every generated map opens in a free drag-and-drop editor where you can move, resize, and recolor exit signs, routes, and equipment icons. Enterprise features like multi-floor support and branded maps are available on paid plans.
Is my floor plan data secure?
Yes. All uploads are encrypted in transit (TLS 1.3) and processed in secure cloud environments. We do not share your floor plans with third parties.
Frequently asked questions
What are the core elements an OSHA evacuation map should include?
A useful workplace evacuation map commonly shows a location-specific YOU ARE HERE marker, available exit doors and routes, directional arrows, an assembly location when the plan uses one, relevant emergency equipment, building or floor identification, and a clear legend. Federal OSHA does not prescribe a universal map-symbol checklist, so confirm site-specific content with the codes adopted by your jurisdiction and the authority having jurisdiction.
Does OSHA give a checklist of what must appear on the evacuation map?
No. OSHA's text in 29 CFR 1910.38 does not enumerate map symbols line by line. It addresses Emergency Action Plan procedures, including evacuation and accountability, when the standard applies. NFPA, ISO, state, local, licensing, and AHJ requirements may add diagram rules. Treat this page as a practical review checklist, not a universal federal mandate.
Do I need to show fire extinguishers and AEDs on the evacuation map?
Show them when the applicable code, emergency plan, or AHJ calls for them, or when doing so helps occupants find equipment that is actually present. OSHA rules governing equipment placement do not automatically require every item to appear on a posted map. Avoid clutter and verify local requirements.
Should the evacuation map show secondary and tertiary exits?
The map should show the available exit routes occupants may use from that location, including an alternate route when one exists. OSHA 1910.36 generally requires at least two exit routes unless an exception applies, but the number and travel-distance limits depend on the building, occupancy, and adopted code.
Does the map need an assembly point and a YOU ARE HERE marker?
A location-specific YOU ARE HERE marker makes a posted diagram usable. Show an assembly point when the site's emergency plan designates one. These features can support orientation and post-evacuation accountability, but federal OSHA 1910.38 does not itself prescribe them as universal map symbols.
How big do labels and symbols on the evacuation map need to be?
ISO 23601 specifies minimum sign sizes based on viewing distance — typical posted maps in offices and corridors are A3 (11.7" × 16.5") or larger with symbols sized so an average reader can interpret them from 8–10 feet away. OSHA 1910.37(b)(7) sets exit-sign letter height (≥6 inches with ≥¾-inch strokes), and the map's EXIT pills should mirror that visual weight. Use plain, sans-serif type, high contrast against the floor color, and avoid clutter.
How often does the evacuation map need to be updated?
Whenever the floor plan changes — walls moved, doors sealed, suites combined, fire-equipment relocated — and at minimum during the annual review of the written EAP. Inspectors and fire marshals look first for a mismatch between the posted map and the current building. Tools like OSHAMap let you regenerate from an updated floor plan in under 60 seconds, which removes the usual excuse for stale maps.
Who should approve the evacuation map before it is posted?
Final review should be confirmed by a qualified safety professional, fire marshal, or the authority having jurisdiction (AHJ) for your facility. The map and the EAP together are the employer's responsibility under the OSH Act of 1970 — an AI-generated draft is a starting point, not a substitute for that professional review.
From guidance to a facility draft
Apply this guidance to a building-specific plan
Use the main maker for any building, or open a focused starting point with facility-specific review questions.
Open the Fire Escape Plan MakerImportant Legal Disclaimer
The Occupational Safety and Health Administration (OSHA) does not approve, endorse, recommend, or certify any commercial products or software. This platform is a compliance assistance tool only and is not affiliated with or endorsed by OSHA or any government agency.
All AI-generated evacuation maps, safety plans, and compliance documents must be reviewed, verified, and approved by a qualified safety professional, fire marshal, licensed engineer, or appropriate authority before being posted, distributed, or used for emergency planning purposes.
Employers retain full legal responsibility for workplace safety under the Occupational Safety and Health Act of 1970 (OSH Act). Users are solely responsible for ensuring compliance with all applicable local, state, and federal regulations. This software does not guarantee OSHA compliance.
This software does not constitute legal, safety consulting, engineering, or professional advice. Content is for informational purposes only. Users should consult qualified safety professionals and legal counsel for compliance guidance specific to their operations.
While we strive for accuracy, workplace safety regulations change frequently. We make no warranties regarding the accuracy, completeness, or current validity of any information. Users must independently verify all regulatory requirements applicable to their specific circumstances.
To the maximum extent permitted by law, OSHAMap, its owners, operators, affiliates, and licensors shall not be liable for any direct, indirect, incidental, special, consequential, or punitive damages arising from use of this service, including but not limited to workplace injuries, OSHA violations, regulatory fines, property damage, or any other losses.
Cost comparisons and savings estimates are based on industry averages for professional safety consultant fees and are provided for informational purposes only. Actual costs, savings, and results may vary significantly based on your specific situation.
By using OSHAMap, you acknowledge that you have read, understood, and agree to be bound by these terms. For complete terms, see our Terms of Service and Privacy Policy.
OSHAMap is not endorsed by OSHA. Review this checklist with a qualified safety professional and verify all requirements that apply to your workplace before use.

